Northern Access Link Expressway

Northern Access Link Expressway
NALEX
Route information
Maintained by SMC Northern Access Link Expressway Corporation
Length136.4 km[1] (84.8 mi)
Phase 1 – 19.4 km (12.1 mi)
Phase 2 – 117 km (73 mi)
StatusUnder construction
RestrictionsNo motorcycles below 400cc
Major junctions
South end E2 (Skyway Stage 3) at Balintawak in Caloocan
Major intersections
North end E1 (Tarlac–Pangasinan–La Union Expressway) in Tarlac City
Location
CountryPhilippines
RegionsMetro Manila, Central Luzon
ProvincesBulacan, Pampanga, Tarlac
Major citiesCaloocan, Valenzuela, Malabon, Obando, Bulakan, Malolos, Tarlac City
Highway system
  • Roads in the Philippines

The Northern Access Link Expressway (NALEX) is a 136.4 km (84.8 mi) under-construction controlled-access toll expressway in the Philippines.[1] It is designed to connect Metro Manila directly to the New Manila International Airport (NMIA) in Bulakan, Bulacan, and extend further north across Pampanga to terminate at Tarlac City.[2]

The tollway is being constructed under a 30-year Supplemental Toll Operation Agreement (STOA) granted by the Toll Regulatory Board (TRB) to San Miguel Corporation (SMC).[3] NALEX serves as Component 1 of SMC's Greater Capital Region Integrated Expressways Network.[1]

Route description

NALEX combines elevated viaducts and at-grade expressways split across two main phases:

Phase 1

Phase 1 spans 19.4 km (12.1 mi).[3] The expressway originates at the northern end of Skyway Stage 3 at the Balintawak Interchange in Caloocan via an elevated viaduct. It proceeds northwards through Valenzuela, Malabon, and Obando before leading directly into the New Manila International Airport complex in Bulakan, Bulacan.[1]

Phase 2

Phase 2 spans 117 km (72.7 mi) as an extension from the airport site in Bulakan.[3] The alignment travels along coastal and inland areas of Bulacan and Pampanga (including Masantol) before heading north to connect with the Tarlac–Pangasinan–La Union Expressway (TPLEX) in Tarlac City.[2]

History

On May 6, 2022, the Toll Regulatory Board (TRB) approved the Supplemental Toll Operation Agreement (STOA) for NALEX with an estimated project cost of ₱148.30 billion.[3] SMC Northern Access Link Expressway Corporation was designated as the concessionaire, while Skyway O&M Corporation was appointed as the tollway operator.

The Department of Environment and Natural Resources (DENR) issued an Environmental Compliance Certificate (ECC) for NALEX Phase 1. Final engineering designs (FED) were subsequently submitted by SMC to the TRB and the Department of Public Works and Highways (DPWH) for final technical review and notice to proceed.[2]

Exits

Exits will be numbered by kilometer markers. Locations and final interchange designs for Phase 1 are based on the alignment published by SMC Infrastructure and the Toll Regulatory Board.

Phase 1, Section 1 (Balintawak to NMIA)

RegionProvinceCity/MunicipalitykmmiExitNameDestinationsNotes
Metro ManilaCaloocanSkyway Stage 3 / Balintawak Interchange E2 (Skyway)Southern terminus
ValenzuelaNo major junctions
MalabonNo major junctions
Central LuzonBulacanObandoNo major junctions
BulakanNMIA InterchangeNew Manila International AirportCloverleaf interchange; northern terminus for Phase 1, Section 1; starting point for Phase 1, Section 2 (to TPLEX) and Marilao Access Link Expressway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

Phase 1, Section 2 (NMIA to Tarlac City)

Phase 1, Section 2 covers the main at-grade expressway entirely within Central Luzon, running from NMIA to TPLEX in Tarlac City and including the BTEX Tabang Link spur. 

ProvinceCity/MunicipalitykmmiExitNameDestinationsNotes
BulacanBulakanNMIA / Bulakan InterchangeNew Manila International AirportSouthern terminus for Phase 1, Section 2; junction with BTEX Tabang Link
GuiguintoTabang InterchangeTerminus of the BTEX Tabang Link spur; connects to NLEX (Sta. Rita Exit area)
PampangaMasantolMasantol InterchangeLocal roadsInterchange along Phase 1, Section 2 main alignment; junction for proposed Phase 2 expansion
GuaguaGuagua InterchangeLocal roadsPhase 1, Section 2 alignment
PoracPorac Interchange E1 (Subic–Clark–Tarlac Expressway)Phase 1, Section 2 interchange with SCTEx
MabalacatMabalacat InterchangeClark Freeport and Special Economic ZonePhase 1, Section 2 alignment near Clark area
TarlacCapasCapas InterchangeNew Clark CityPhase 1, Section 2 alignment
Tarlac CityTPLEX / Tarlac City Interchange E1 (Tarlac–Pangasinan–La Union Expressway) – BaguioNorthern terminus of Phase 1, Section 2 connecting to TPLEX
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also

References

  1. ^ a b c d "Northern Access Link Expressway". SMC Infrastructure. Retrieved August 6, 2026.
  2. ^ a b c Jose, Ashley Erika O. (November 21, 2024). "TRB sees implementation of 3 SMC toll road projects next year". BusinessWorld. Retrieved August 6, 2026.
  3. ^ a b c d "SMC to proceed with full-blast NALEX construction by Q4". Daily Tribune. June 26, 2024. Retrieved August 6, 2026.

Content Disclaimer

Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.

  1. The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
  2. There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
  3. It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
  4. Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
  5. Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.