Northern Access Link Expressway
This article coincides in timing and pattern with contributions by the same user which have been determined to be AI-generated, and has no significant contributions by other editors. It is presumed to have also been AI-generated, and may be assumed to violate Wikipedia's policies and guidelines. If no editor takes responsibility for it within a five-day grace period, this article may be deleted. To object to proposed deletion, an editor may take responsibility for the content and assume the onus to achieve consensus for its inclusion. Assuming responsibility requires that all content and its sources be closely reviewed, and reworked as needed, to ensure that they comply with polices and guidelines. This may involve checking that the cited sources support the content and are reliable, determining whether the content is due for inclusion, and rewriting the content to revise any tone issues and resolve possible copyright violations. Once this has been done, this template may be removed. The nominator also gave the following reason for this proposed deletion:
Find sources: "Northern Access Link Expressway" – news · newspapers · books · scholar · JSTOR Reviewer tools: guideline project (talk • log) Move: draft space The article may be deleted if this message remains in place for five days, i.e., after 16:18, 27 August 2026 (UTC). Nominator: Please consider notifying the author if active: {{subst:prodwarningLLM|Northern Access Link Expressway|concern=[[WP:LLMPRV|Presumptive removal of LLM-generated content]], see [[Wikipedia:AI noticeboard#User:Jussie2024]]. Feel free to reinstate by following [[WP:LLMPRVOBJ|the procedures for disputing presumptive removal of LLM-generated content]].}} ~~~~ |
| Northern Access Link Expressway | |
|---|---|
| NALEX | |
| Route information | |
| Maintained by SMC Northern Access Link Expressway Corporation | |
| Length | 136.4 km[1] (84.8 mi) Phase 1 – 19.4 km (12.1 mi) Phase 2 – 117 km (73 mi) |
| Status | Under construction |
| Restrictions | No motorcycles below 400cc |
| Major junctions | |
| South end | |
| North end | |
| Location | |
| Country | Philippines |
| Regions | Metro Manila, Central Luzon |
| Provinces | Bulacan, Pampanga, Tarlac |
| Major cities | Caloocan, Valenzuela, Malabon, Obando, Bulakan, Malolos, Tarlac City |
| Highway system | |
| |
The Northern Access Link Expressway (NALEX) is a 136.4 km (84.8 mi) under-construction controlled-access toll expressway in the Philippines.[1] It is designed to connect Metro Manila directly to the New Manila International Airport (NMIA) in Bulakan, Bulacan, and extend further north across Pampanga to terminate at Tarlac City.[2]
The tollway is being constructed under a 30-year Supplemental Toll Operation Agreement (STOA) granted by the Toll Regulatory Board (TRB) to San Miguel Corporation (SMC).[3] NALEX serves as Component 1 of SMC's Greater Capital Region Integrated Expressways Network.[1]
Route description
NALEX combines elevated viaducts and at-grade expressways split across two main phases:
Phase 1
Phase 1 spans 19.4 km (12.1 mi).[3] The expressway originates at the northern end of Skyway Stage 3 at the Balintawak Interchange in Caloocan via an elevated viaduct. It proceeds northwards through Valenzuela, Malabon, and Obando before leading directly into the New Manila International Airport complex in Bulakan, Bulacan.[1]
Phase 2
Phase 2 spans 117 km (72.7 mi) as an extension from the airport site in Bulakan.[3] The alignment travels along coastal and inland areas of Bulacan and Pampanga (including Masantol) before heading north to connect with the Tarlac–Pangasinan–La Union Expressway (TPLEX) in Tarlac City.[2]
History
On May 6, 2022, the Toll Regulatory Board (TRB) approved the Supplemental Toll Operation Agreement (STOA) for NALEX with an estimated project cost of ₱148.30 billion.[3] SMC Northern Access Link Expressway Corporation was designated as the concessionaire, while Skyway O&M Corporation was appointed as the tollway operator.
The Department of Environment and Natural Resources (DENR) issued an Environmental Compliance Certificate (ECC) for NALEX Phase 1. Final engineering designs (FED) were subsequently submitted by SMC to the TRB and the Department of Public Works and Highways (DPWH) for final technical review and notice to proceed.[2]
Exits
Exits will be numbered by kilometer markers. Locations and final interchange designs for Phase 1 are based on the alignment published by SMC Infrastructure and the Toll Regulatory Board.
Phase 1, Section 1 (Balintawak to NMIA)
| Region | Province | City/Municipality | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|---|
| Metro Manila | Caloocan | Skyway Stage 3 / Balintawak Interchange | Southern terminus | |||||
| Valenzuela | No major junctions | |||||||
| Malabon | No major junctions | |||||||
| Central Luzon | Bulacan | Obando | No major junctions | |||||
| Bulakan | NMIA Interchange | New Manila International Airport | Cloverleaf interchange; northern terminus for Phase 1, Section 1; starting point for Phase 1, Section 2 (to TPLEX) and Marilao Access Link Expressway | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||||
Phase 1, Section 2 (NMIA to Tarlac City)
Phase 1, Section 2 covers the main at-grade expressway entirely within Central Luzon, running from NMIA to TPLEX in Tarlac City and including the BTEX Tabang Link spur.
| Province | City/Municipality | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|
| Bulacan | Bulakan | NMIA / Bulakan Interchange | New Manila International Airport | Southern terminus for Phase 1, Section 2; junction with BTEX Tabang Link | |||
| Guiguinto | Tabang Interchange | Terminus of the BTEX Tabang Link spur; connects to NLEX (Sta. Rita Exit area) | |||||
| Pampanga | Masantol | Masantol Interchange | Local roads | Interchange along Phase 1, Section 2 main alignment; junction for proposed Phase 2 expansion | |||
| Guagua | Guagua Interchange | Local roads | Phase 1, Section 2 alignment | ||||
| Porac | Porac Interchange | Phase 1, Section 2 interchange with SCTEx | |||||
| Mabalacat | Mabalacat Interchange | Clark Freeport and Special Economic Zone | Phase 1, Section 2 alignment near Clark area | ||||
| Tarlac | Capas | Capas Interchange | New Clark City | Phase 1, Section 2 alignment | |||
| Tarlac City | TPLEX / Tarlac City Interchange | Northern terminus of Phase 1, Section 2 connecting to TPLEX | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| |||||||
See also
References
- ^ a b c d "Northern Access Link Expressway". SMC Infrastructure. Retrieved August 6, 2026.
- ^ a b c Jose, Ashley Erika O. (November 21, 2024). "TRB sees implementation of 3 SMC toll road projects next year". BusinessWorld. Retrieved August 6, 2026.
- ^ a b c d "SMC to proceed with full-blast NALEX construction by Q4". Daily Tribune. June 26, 2024. Retrieved August 6, 2026.
External links
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.