Bali–Java Powerline
| Bali–Java Powerline | |
|---|---|
| Location | |
| Country | Indonesia |
| Province | Bali East Java |
| Coordinates | 8°5′58.55″S 114°26′12.52″E / 8.0995972°S 114.4368111°E (Bali tower) |
| Ownership information | |
| Owner | PT PLN |
| Technical information | |
| Type | Overhead line |
| Total length | 219.16 km (136.18 mi) |
| No. of transmission towers | 512 |
| Power rating | 1,600 MW |
| AC voltage | 500 kV |
The Bali–Java Powerline is a planned electric power transmission line in Indonesia. It will be used for the crossing of the Bali Strait between Java and Bali. If built, the towers will be the world's tallest electricity pylons with a height of 376 metres (1,234 ft).[1] As of January 2018, the project is underway with planning for land acquisition.[2] However, as of April 2018, there are also indications that the project may never come to fruition as there is substantial resistance to the project for religious and cultural reasons.[3]
The line on the Java side will begin in at the Paiton power plant, then through Watu Dodol in Banyuwangi Regency, and on to Bali.[4] On the Bali side, it would be in parts of western Buleleng, Jembrana, Tabanan and Badung regencies.[5]
The two towers that will carry the line over the Bali Strait (Selatbali) have planned positions as follows: 8°5′21.73″S 114°24′53.12″E / 8.0893694°S 114.4147556°E for the 363-metre tower (1,191 ft) on Java and 8°5′58.55″S 114°26′12.52″E / 8.0995972°S 114.4368111°E for the 376-metre tower (1,234 ft) on the Bali side.[6]
References
- ^ "PLN to build world's tallest power pylons Java to Bali". The Jakarta Post. 21 September 2010. Archived from the original on 2 April 2013. Retrieved 14 April 2012.
- ^ "Updated Land Acquisition and Resettlement Plan (LARP)" (PDF). Asian Development Bank. January 2018. Retrieved 9 September 2018.
- ^ McBeth, John (26 April 2018). "Bali struggles to keep the lights lit". Asia Times. Retrieved 9 September 2018.
- ^ "PLN To Build Java-Bali Transmission Towers". The Beat Magazine. March 30, 2011. Retrieved April 15, 2012.[permanent dead link]
- ^ "Residents Raise a Racket Over PLN'S 'Save Bali' Plan". The Bali Times. April 26, 2010. Retrieved April 15, 2012.
- ^ For reports about the project, see Asian Development Bank (July 2018). "documents relating to the Java–Bali 500 kV Power Transmission Crossing Project". Asian Development Bank. Retrieved 23 July 2018. The portion of the powerline crossing the Bali Strait is "Component 3".
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.